Several LoadLeveler job command language keywords are associated with parallel jobs. Whether a keyword is appropriate is dependent upon the type of job and the type of LoadLeveler scheduler you are running.
Table 7 shows you the parallel keywords supported by
LoadLeveler's Backfill and Gang schedulers, based on the type of job you
are running.
Table 7. Parallel keywords supported by the Backfill and Gang scheduler
| job_type=parallel | job_type=pvm3 |
|---|---|
|
|
Table 8 shows you the parallel keywords supported by the default
LoadLeveler scheduler, based on the type of job you are running.
Table 8. Parallel keywords supported by the default scheduler
| job_type=parallel | job_type=pvm3 |
|---|---|
|
|
These keywords are used in the examples in this chapter, and are described in more detail in Job command file keywords.
If you disable the default LoadLeveler scheduler to run an external scheduler, see Usage notes for an explanation of which keywords are supported.